Hemisson - Designed for Education

B) BATTERY INSTALLATION

 

1) CHECK SWITCHES: ALL LEFT-SIDE

2) CHECK ON/OFF SWITCH: MUST BE OFF (REAR-SIDE)

3) CHECK PGM/EXEC SWITCH IS IN EXEC POSITION (FRONT-SIDE)

4) PLUG BATTERY TO THE CONNECTOR ACCORDING TO POLARITY.

5) INSERT THE BATTERY DOWN IN ITS LOCATION. TAKE CARE NOT TWISTING NOR WEDGING THE CABLE.

6) THE ROBOT IS READY TO BE TESTED.

 

< PREVIOUS NEXT >

 

 

 
  © 2003 K-Team SA All Rights Reserved.        
info@hemisson.com Visit K-Team.com